 |
 |
 |
| About this data sheet: |
| Structure-ID: |
s0000650 |
| Created on: |
04/01/00 |
| Modified on: |
08/26/10 |
|
 |
 |
|
 |  |  |
|
|
|
|
Structural Type:
|
|
|
Function / usage:
|
|

|

|
| Description | Value |
| cables |
steel
|
| pylon |
reinforced concrete
|
| deck |
composite steel-reinforced concrete
|
|
| |
main span |
274.32 m | | |
length of side spans |
91.44 m - 185.32 m |
| deck |
deck depth |
1.52 m | | |
deck width |
12.20 m |
|

|

 |
Grant, Arvid Design and construction of the East Huntington Bridge, in
"PCI Journal", 1988, n. 1 v. 32 .
|
 |
Svensson, Holger Personal Involvement in early US Cable-Stayed Bridges, presented at 17th IABSE Congress, Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, September 17-19, 2008.
|
 |
Walther, René Ponts haubanées, Presses Polytechniques et Universitaires Romandes, Lausanne (Switzerland) , ISBN 2880740916, 1985; pp. 56.
|
|
|
 |