 |
 |
 |
| About this data sheet: |
| Structure-ID: |
s0006025 |
| Created on: |
10/06/02 |
| Modified on: |
12/07/09 |
|
 |
 |
|
 |  |  |
Mike O'Callaghan-Pat Tillman Memorial Bridge |
| Hoover Dam Bypass-Colorado River Bridge |
 |
|
Built:
|
2005
- 2010
|
| Status: |
under construction
|
|
Location: |
Boulder City, Clark County, Nevada, USA
|
|
Crosses: |
Colorado River
|
|
Carries: |
U.S. Route 93
|
|
|
|
Structural Type:
|
|
|
Function / usage:
|
|
| Near: |
Hoover Dam (1935)
|
| Part of: |
Hoover Dam Bypass
|

|

|
| Description | Value |
| deck |
steel
|
| arch |
concrete
|
|
| |
rise |
84.5 m | | |
total length |
579 m | | |
arch span |
323 m |
|

| End of November 2004
|
| Expected beginning of construction of the bridge over the Colorado River. |
| September 2006
|
| The high-line system collapses due to high winds, causing significant delays in construction as the opening date is moved from 2008 to 2010. |
| Mid of 2008
|
| Expected completion. |
|

|

 |
Close call, in
"Bridge Design & Engineering", 3rd Quarter 2009, n. 56 v. 15 .
|
 |
Dual purposes, in
"Bridge Design & Engineering", 2nd Quarter 2008, n. 51 v. 14 .
|
 |
Life line, in
"Bridge Design & Engineering", 1st Quarter 2008, n. 50 v. 14 .
|
 |
New high-line in progress for Colorado River Bridge, in
"Bridge Update", October 2007, n. 71 .
|
 |
Goodyear, David The New Colorado River Arch Bridge at Hoover Dam, presented at fib Symposium 2004, 26-28 April 2004, Avignon.
|
 |
Shutt, Craig A. T.Y. Lin International Excels With Project Partners’ Input, in
"ASPIRE", Winter 2008 .
|
|
|
 |